Solar Panels Generates Electricity From Daylight
Jacob Eco Energy Ltd is the first Solar Panel Installation company in Manchester to be MCS approved (Microgeneration Certification Scheme). Only solar panels fitted by a MCS approved installer can access the payments for the Feed-In-Tariffs.
| Size of Solar Panel System | |||
| Income and Savings generated | 2 kWp | 3 kWp | 4 kWp |
| Average initial cost of installation | £6,495 | £7,495 |
£8,995 |
| Estimated Annual Generation from solar panels (kWh)* | 1,717 kWh | 2561 kWh |
3,414 kWh |
| Estimated Income from Feed In Tariff (25 years) | £13,925 | £20,891 |
£27,8504 |
| Estimated Savings on electricity bills (25 years) | £7,912 | £11,871 |
£15,825 |
| Total Payback (25 years) | £22,199 | £33,306 |
£44,399 |
| Estimated payback (years) | 10.6 years | 8.5years |
7.8years |
| ROI in year 1 (%) | 7.8% | 10.1% |
11.2% |
| Carbon dioxide reduction over 25 years (Kgs) | 22.84 | 34.27 |
45.68 |
*Based on government SAP calculations – south facing, 30 degree pitch, no shading and at the new FIT rate of 21p.
The Feed in Tariffs are index linked to the RPI, thus adjusted to keep in-line with inflation and tax free for domestic installations.
The Feed-In-Tariffs are guaranteed for 25 years from the date of your installation.